June 13, 2005.
The tourist farm was located by the roadside. Every morning, guests hurried to town and the farm emptied. Guests with bank cards, however, preferred to stay in hotels, since credit card use was not possible at the tourism farm. The farm needed changes...
The tower technician installed a 20 m lattice mast on a hill and anchored guy wires into the ground.
http://admin.wifi.ee//Dokumendid/1-mast1.jpg
The ISP (internet service provider) installed an AP on a mobile mast 8 km away and a bridge on the tourism farm mast, adding antennas. A cable was run from the mast to the farm buildings and a Wi-Fi transmitter was installed on the guest house wall. (Each building required a separate transmitter because the 2.4 GHz signal could not pass through stone wool insulation used in the walls, nor through sheet metal roofs, snow, or rain-wet window glass.)
http://admin.wifi.ee//Dokumendid/avaya.jpg
The mast belongs to the farmer, but all devices belong to the ISP company and the farm pays a monthly fee for the service and equipment. However, the farm can change the ISP if needed.
Project facts. Each meter of mast costs over 1000 kroons, plus transport and installation. The internet external connection speed is over 1 Mbit. ISP monthly fee plus equipment rental is over 1000 kroons.
For more information, send an email to the editorial office [EMail,](mailto:veljo@wifi.ee) indicating your exact location, request, and contact. In every county, there is an ISP company capable of carrying out similar projects. The mast installer is located in Harju County.